Minconsult Sdn Bhd
Minconsult’s foray into Airport Development started with the establishment of Airports Division in 1971.
The Government of Malaysia has appointed Global Upline Sdn Bhd in September 2004 for the redevelopment of Kuching International Airport to cater for unrestricted operation of B747 aircraft.
Recommendations were made on expenditures and investment levels required over the plan period, priorities for new airport development, master planning studies, implementation schedules and overall development programme and phased upgrading of services and facilities.
The new Sibu airport was originally planned to serve A300 aircrafts and Minconsult in association with PRC Speas of USA completed the designs and tender documents in 1985. However due to funding constraints, Minconsult was commissioned to redesign the new airport to serve only B737 aircraft operations
The Government of Malaysia, in year 2002, intends to redevelop the airport at Alor Setar to handle aircraft up to and including the Airbus 330 aircraft.
Other works under the scope included for airfield ground lighting, instrument landing system, arrestor gear, and the relocation of navaids and comaids equipment to the new air traffic control tower
The Bridge Division claims over 45 years of experience delivering consistently high standards of quality in its services, and is recognized as a leading engineering consultant in its field.
Construction of 31.8 KM elevated highway from Sungai Besi to Ulu Kelang. . The mainline starts from the existing Shah Alam Highway (KESAS) at Bukit Jalil in the South and ends at Middle Ring Road 2 (MRR2) at Ulu Kelang in the North.
Construction of all infrastructure works including trackworks, earthworks, geotechnical, drainage, rail and road bridge and stabling lines for an electrified double track project of length 68km and of design speed 160 km/h between Bidor and Ipoh.
The project road is about 110 km Mazar Sharif – Sheberghen road section and the 48 km section of the Sheberghen – Andkhoy road
Replace existing timber bridge of 30.3m long with new reinforced concrete bridge to maintain network safety
Construction of road widening from the existing dual 3-lane carriageway to dual 4-lane carriageway including other associated works such as realignment of interchange ramps to accommodate the traffic growth and the expected rapid increase in generated traffic
Improve connectivity to Kuala Lumpur Sentral Station and MRT Muzium Negara Station to cater for the needs of the disabled as well as to handle heavy passanger volume during peak hours
Construction of 4 new lane of 1km bridge and 3.5km of road widening to cater the upcoming expansion of development in Kemaman District, Terengganu
The proposed BRT – Sunway Line will involve construction of elevated 2 lane busway (one lane in each direction) from KTMB Setia Jaya to LRT USJ 6 (Station No. 7) at Persiaran Kewajipan opposite Sime Darby. The proposed line will consist of 7 halts and approximately 5.4km of Busway.
The bridge consist of 24m single span pedestrian crossing bridge structure with steel truss and bracing for superstructure while having reinforced concrete beams and columns with staircases for substructure
KLIA Transit is a commuter rail service in Kuala Lumpur, Malaysia between Kuala Lumpur Sentral (KL Sentral) and Kuala Lumpur International Airport (KLIA) and klia2.
Wetland crossing and flyover at interchanges, Phase 1A Package R2 & R3 Purtajaya Development
Kelana Jaya LRT from Kelana Jaya Depot to Putra Heights
Independent Check Consultant
The Electrical Division of Minconsult Sdn Bhd traces its beginning back to 1971. Over the years, the Electrical Division has grown in experience and staff strength to undertake challenging projects involving MV and LV distribution systems for commercial, residential, and industrial buildings, power plants, infrastructure projects, sewage and water treatment plants and pumping stations .
Menara CIMB received certifications from Building and Construction Authority (BCA) and Green Building Index Sdn Bhd for Green Mark Gold and Green Building Index (GBI) Certified respectively
The building is equipped with state-of-the-art services such as the Hybrid Destination-based lift system for High Zone Lifts, integration between lift card access system with pedestrian access system and the high level integration of fire alarm system with the Building Management System
The building is provided with state-of-the-art building services such as full destination-based lift system
An iconic building incorporating sustainable design elements which enhance its operational efficiency
Financial Park Complex is the largest integrated commercial landmark in the Federal Territory of Labuan which caters for the needs of off-shore banks. It corporates a state-of-the-art building management system.
The project comprises an advanced Postal Automation System e.g. Integrated Production Planning System (IPPS) which improves the speed and delivery performance, reduction in customer’s complaints and contributing in overall economic growth.
Baggage Handling System linking Satellite Building and Express Rail Link Platform in Kuala Lumpur International Airport to facilitate checking out of passengers and baggage at Kuala Lumpur Sentral Station
Improved the sewerage services in Bandaraya Melaka by increasing the coverage ratio and part of Sungai Melaka River Rehabilitation and Beautification initiative. In addition, the STP was designed to meet the Category 1 of DOE Requirement (Year 2009
For better crime prevention and law enforcement in Yan District, Kedah.
266 units completed on time and within budget
Our experience in the provision of these services range from linear projects, power plants and petrochemical facilities, renewable energy (biogas and mini hydro) projects, Waste-to-Energy facilities, water treatment plants, and sanitary landfills.
Improve the selected cities access to quality urban services and ..
To monitor environmental, health and safety compliance of the project ..
Improvement of sewerage services within the Peninsular Malaysia and ..
Ensure that all the environmental mitigation measures are properly ..
The study will identify and evaluate potential negative environmental ..
To monitor environmental compliance of the project’s construction ..
To manage Langkawi Island’s solid wastes disposal in a more efficient ..
Rationalization of the identified STPs provide a more efficient sewage ..
Plan and programme developed will monitor the groundwater quality ..
Ensure that the HSR project is implemented with the least possible ..
To ensure adequate and efficient sewage treatment services and ..
Promote and advocate environmental sustainability in development ..
Geotechnical expertise within Minconsult has been built over more than 55 years through experiences on hundreds of projects in Malaysia and around the world.
LRT Line extension from the original 29 km, comprised 17 km elevated..
RedQ comprised a 6-storey office block including 3 lev..
Detailed engineering design for platform underlain by 30m very soft..
Detailed land reclamation design for 750,000 m3 storage terminal..
An existing landfill with extremely heterogenous wastes and slopes ..
Stability assessment of 8 nos. highway rock slopes with total length of 2 km..
The facilities include a 1650m semi high-speed test track at top speed of..
A 75 km railway track linking Kuantan Port and Kerteh ..
Development of a new campus for AIMST University on a 173-acre site..
The packages comprised a 700m bridge and 4 approach ramps..
Possessing over 50 years of experience since 1965, Highway Division is the pioneer in the planning, design and construction supervision of highway projects in Malaysia as well as several overseas projects financed by World Bank and Asian Development Bank.
The first expressway in Cambodia. It will act as an efficient network between ..
The upgrading of 13 km roadworks from dual one-lane to two-lanes dual ..
The upgrading of 19km road from dual one-lane to two-lane dua ..
A guidance for the concessionaire to conduct the systematic ..
Upgrading from single carriageway (2-lanes) into dual carriageway ..
Raise the prevailing low Level of Service (LOS) from D to C and to accommo ..
To ease congestion of the traffic at Kuala Lumpur City Center by using..
The project increased the capacity of the road system and met the roadusers..
Raise the prevailing low Level of Service (LOS) from D to C and to accommodate..
Linking the east and west coast at the Northern sector of Peninsular ..
Minconsult IT Department started to be actively involved in updating the Corporate ICT Solutions since 2000 and has since grown into a business entity registered with Ministry of Finance ( MOF ) with expert staffs which are competent in enterprise system migration/deployment, network, communication infrastructure and data center design and development.
Design, supply, install and commission a comprehensive Building ..
Study, review and propose ICT system design that is ..
Since 1973, Infrastructure Division has been providing engineering inputs for green field and urban renewal projects from planning stage to completion and transfer of constructed facilities and consulting on technical and regulatory criteria for construction of townships and resorts, industrial parks and educational institutions.
Development of total area measuring approximately..
The entire development includes hotels, Sewerage..
Carried out a comprehensive study of the entire water..
The project comprises the development of the Outdoor..
This is a development of a tertiary education institution comprising ..
The project involves performing site inspections and technical..
The scope of consultancy services comprises planning, engineering..
The Development development of some 700 acres of land, located..
The project involves implementing basic infrastructure..
Our marine projects ranged from containers, bulk handling, all cargoes, passengers, coal, specialized chemicals, to oil and gas. Our port planning experience includes the National Port Development Plan policy study, encompassing macro-economic studies, traffic forecasting, financial modelling and tariff reviews.
Upgrading of existing container Wharf 8 Northport for berthing of Super Panamax..
Preparation of Master Plan for Similajau Port, located within ..
Minconsult provided the Project Management and Basic Engineering Consul..
Provision of detailed design and construction supervision of a jetty ..
Vast experience with talented and vibrant team eager to undertake challenging projects ranging from commercial, residential and industrial buildings, power plants, pump stations, sewage and water treatment plants. Strong capability in undertaking design of high-performance sustainable buildings with full implementation of Building Information Modelling (BIM).
Menara CIMB received certifications from Building and Construction..
The building is equipped with state-of-the-art services such as ..
The building is provided with state-of-the-art building services such ..
An iconic building incorporating sustainable design ..
Financial Park Complex is the largest integrated commercial landmark..
The project comprises an advanced Postal Automation System ..
Baggage Handling System linking Satellite Building and Express ..
Improved the sewerage services in Bandaraya Melaka by increasing ..
For better crime prevention and law enforcement in Yan District ..
266 units completed on time and within budget ..
Planning Division has expertise in providing Town Planning Consultancy Services to undertake Urban and Regional Planning studies, Development Layout Plan and Masterplan , Development Plan studies, and Land use Planning.
The masterplan is to ensure the landuse planning is carried out in an ..
The Kajang Local Plan is a written statement supported by plans ..
To formulate the Concept Plan and Implementation Plan to develop ..
Submission of Application for Planning Permission (KM) to the ..
Create KLIA into a Vibrant Airport City and for it to become ..
KPP has been identified as one of the key oil, gas ..
This guideline will be used by local authorities, ..
The proposed development components include..
In carrying out the development, UTeM need to obtain Planning..
Mixed use development promotes the concept..
Power & Industrial Division has been involved in most of the power projects in Malaysia as well as in the ASEAN Region since 1969 enabling the division to develop a core of professionals and sub-professionals skilled in the detailed engineering design and construction supervision.
Lumut or Segari Power Plant is a combine cycle gas turbine power plant ..
The project achieved the target Commercial Operation Date within budget
The plant is the biggest coal-fired power plant in South East Asia and it was completed in 38 months, 10 months ahead of the average construction time-frame
An addition two blocks of 750MW gas-fired combined cycle power plants with ..
Connaught Bridge Power Station is one of the oldest power stations in ..
The power plant will be able to generate 1,000MW upon demand and ..
The PCP is one of the facilities has been developed within Petronas' ..
The new high efficiency power plant is built on the same site as the ..
Detail Design was performed to British Standards/ Codes and complying with ..
Phase 1, 2 x (300-400MW) coal-fired power plant units was developed for ..
Sumitomo Corporation was appointed to lead a Consortium of Japanese ..
Power Plant & Renewable Energy Division (PPRE) is dedicated to Mechanical, Electrical, Control & Instrumentation, Civil and overall engineering co-ordination as both Owner’s Engineers and as EPC Contractor’s Detailed Design Engineers
The 1,440MW CCPP is capable of achieving more than 62% ..
Manjung 4, as it is known locally, is the fourth power plant constructed ..
The unit is capable of meeting or exceeding the IFC – World bank and Malaysian..
Payra power station is a proposed 1,320MW (2x660MW) thermal ..
The gas-fired power plant is a key project in the ‘Power Up Sabah’ initiative..
The GTCC power plant generates electricity in two stages through ..
The main objective of the Project is to compensate the power scarcity..
The Combined Cycle gives the plant good thermal efficiency and operationa..
The solar power system for MasKargo will provide energy savings which makes..
The feasibility study would consider that, the plant would be a dual-fired ..
To assess TNB’s management and engineering performance in fulfilling its ..
Project Management expertise within Minconsult has been developed for more than 20 years through experience in multiple projects in Malaysia and overseas. This includes the inception stage, feasibility study, planning stage, costing, permitting, contract administration, construction management, risk management and project closure.
A gigantic main roof that covers 4 main buildings of the complex. The ..
The railway line is a dedicated cargo freight line carrying petroleum and ..
Due to the increase in ridership for KL Monorail, new 4-car trains will ..
The hotel will be one of the tallest hotels in Phnom Penh ..
The 1000 m elevation road goes through the 14 km Kuyuk Pass and the 12 km Momusholy..
Public Health Division is known as the leading civil sewerage works expert nationwide with excellent experience of developing the sewerage system from townships to airports.
The sewerage system is to serve the new permanent low cost international..
The Phase 1 Sewerage Works project consists of 29.5 km gravity sewers..
The rehabilitation works are to enable the sewerage works that have been..
Mixed development for commercial and residential units. The development ..
Planning, engineering studies and detailed engineering design for 0.9 ..
Sewerage facilities involves the construction of 9.0 km on piled gravity ..
The sewerage master plan the area developed by CSSB is divided into 2 ..
The NSCP focused on presenting effective frameworks and direction to ..
To improve the public health sector via centralized mechanised sewage ..
This project aims to improve the existing sewerage facilities via a ..
As an Engineering Consultancy Firm, we have a comprehensive supply network management system that complies with our ISO9001:2015 Quality Management System. It includes the rigorous screening of qualified & experienced potential Sub-consultants/Sub-contractors (Suppliers) and assessment of their performances during the project contract period yearly.
Minconsult is capable of undertaking all engineering for metro, high speed rail, mainline rail, monorail and bus rapid transit. This includes the stages of feasibility study, planning, detailed design consultancy, independent auditing, systems integration and system assurance.
Total of 17.4km Below Ground and Elevated twin track for automated trains ..
The route traverse through densely built-up areas of Petaling Jaya and Shah Alam..
5.8km elevated tracks, 6 stations and Depot Workshop with Operations Control Centre..
This is a dedicated freight line to connect the petrochemical complexes of Gebeng..
This was part of the Peninsular Malaysia Electrified Double Tracking Project between..
Due to the increase in ridership for KL Monorail, new 4-car trains will replace the..
To provide driverless fully automated link between the Main Terminal Building..
New line of estimated 40km length to serve the Kuala Lumpur suburbs of Cheras..
Feasibility study for a new MRT line to enhance connectivity between existing..
Carried out technical feasibility of the project by simulating different operation..
Structure Division has been in this field for more than 50 years setting new standards and delivering successful projects consistently. We are experts on superstructures and substructures with high quality of design and supervision for concrete, steel, post-tension and foundations
The project area is approximately 10 acres with a plot ratio of 1:6, one of ..
Tower 3 was designed with a combination of RC and Post Tensioned Concrete frame ..
PETRONAS Leadership Campus (PLC) is envisioned to be a state-of-the-art learning ..
Police headquarter consisting Administration Block
Integrated Bus & Taxi Terminal, Government Building Complex ..
The Transportation Division has an impressive resume of over 100 feasibility & transport studies for public transport projects, both in Malaysia and internationally, and demonstrates expertise in all types of transportation studies from the national level to Traffic Impact Assessments (TIA) for development.
Traffic Study for Jalan Lapangan Terbang Subang Lama from the Federal Highway ..
The benefit will attract more commuters to the LRT services and thus ..
To upgrade the existing Kuantan By-pass Road by widening the existing ..
To ensure construction is achieved in time within budget ..
Construction of a new depot with stabling yard and relevant ..
LRT3 is in line with SPAD’s Urban Rail Development ..
The study included review of previous studies, define policy ..
To develop cost estimates for the land and civil works; review..
The areas along the west coast of Malaysia in the State of Kedah ..
The study consists of ridership and traffic study..
The packages were implemented as Design and Build Contracts. The road ..
Water Resources Division has a long track record in undertaking feasibility studies, master plan preparation, detailed design, project management and constructions supervision of water resources, drainage, flood mitigation and coastal projects for Government and Public Sector.
Movenpick Resort & Spa is constructed along the southern part of Pantai Pandak a relatively short beach located between the larger cities of Marang and Kuala Terengganu.
The issues addressed were coastal erosion and damaged revetment along a certain coastal stretch Kertih Port area. The protection works comprised construction of sheet pile, revetment and RC wall
Minconsult was awarded with the Malaysian Construction Industry Excellence Awards 2015 for Best Project Award (Building Project – Medium) for the Development of Exhibition and Conservation Centre for Giant Panda and Other Related Works in Zoo Negara
The total study area comprises 9.7 km and the detailed design involved 8 headlands and its beach nourishment. Minconsult was awarded with the 2017 ACEM Engineering Awards – Gold Award of Special Merit for Coastal Protection Works at Teluk Lipat, Dungun Terengganu
We studied the impact of development of 6 major rivers basins namely Sg. Tawau, Sg. Kubota, Sg. Kinabutan Besar, Sg. Kinabutan Kecil, Sg. Tiku and Sg. Tanjung Batu and formulated a stormwater management and drainage masterplan for the long-term development
We reduced the drainage problems at low-lying areas adjacent to Sg. Kerian, provided telecontrol/automation and monitoring system for pumping operations, optimised water resource utilization, improved water use efficiency and facilitated adequate, timely and equitable water supply for intensive paddy cultivation
The Juru/Alma areas were faced with frequent flash floods and prolonged inundation. The study was to propose feasible flood mitigation and drainage improvement works and to propose conceptual and preliminary engineering design and preliminary land acquisition requirements
The existing drain experienced frequent flooding due to its under capacity and tidal effect. The project included designing and constructing of about 2.7km main drain along Jalan Raja Lumu and about 7.5km along Jalan Pendamaran /Jalan Banting
The works comprised the river improving works for Sg. Pinang and its tributaries, Sg. Keluang, Sg. Ara, Sg. Relau, Sg. Gelugor and Sg. Dua Besar. The project also included urban drainage improvement works for the S10, S18 and N12 Drainage Basin
The principal aim of agricultural development in Tumboh Swamp is to increase agricultural production and farmers’ incomes so as to alleviate poverty among the target group and to ensure gainful employment for development in the region
The Water Supply Division in Minconsult has involved in the works for the water reticulation study, pipe replacement and water treatment plant works for sustainable future development.
Carried out a comprehensive study of the entire water supply system in Lipis district, Pahang to assess the capacity level of the existing water treatment plants (WTPs) and water distribution system in fulfilling the current and future water demand
The project involves performing site inspections and technical assessment of the condition of water distribution assets owned by SYABAS in the northern districts of Selangor, prioritizing the required rehabilitation and upgrading works, developing an asset replacement programme, and estimating the total cost
It seems we can’t find what you’re looking for. Perhaps searching can help.