Second Penang Bridge – Package 3A, 3B and 3C
Client
Jambatan Kedua Malaysia Sdn Bhd
Project Completion
2014
Brief Project Description
Second Penang Bridge – Land Expressway from Batu Maung (Penang) to Batu Kawan (Mainland)
Services Provided
Independent Checking Engineer for proposed Land Expressway
Key Significance of the Project
The packages comprised a 700m bridge and 4 approach ramps on embankments, a 5600m at-grade expressway with 4 crossings on high embankments of 10.5m and a trumpet interchange with 800m embankments. Ground improvement works include surcharging with PVD, stone column and piles