Prai 1071MW Combined Cycle Gas Turbine Power Plant

Client

Samsung C&T

Project Completion

2015

Brief Project Description

Planting up of a new 1071MW CCGT Power Plant on the site of the demolished Prai Power Plant

Services Provided

Detailed Engineering and Design of C&S, Architectural, Infrastructure and M&E Building Services, Local Authority Approval for all buildings to obtain CCC

Key Significance of the Project

The new high efficiency power plant is built on the same site as the TNB’s demolished Prai Power Plant, comprising of 2 blocks of single shaft combined cycle gas turbines that utilise the most efficient H-class technology gas turbine (SGT5-8000H) with a block efficiency of approximately 60%