PROTON Semi High-speed Test-track Project

Client
Nippon Road (M) Sdn Bhd
Project Completion
1994
Brief Project Description
Design & construction of various car testing facilities at Proton plant.
Services Provided
Detailed engineering designs of car testing facilities for PROTON under a turnkey contract.
Key Significance of the Project
The facilities include a 1650m semi high-speed test track at top speed of 120 km/h with 45o steep-bank curve at each end. Also includes a 140m long shower/wading trough, a 500m long brake test track and 30 simulation tracks with several different roadway surfaces