KELANA JAYA LRT

Client

PRASARANA

Project Completion

2015

Brief Project Description

Kelana Jaya LRT from Kelana Jaya Depot to Putra Heights

Services Provided

Detailed Design of elevated guide ways and Supervision of construction

Bridge Division's

Portfolio

Construction of all infrastructure works including trackworks, earthworks ..

The project road is about 110 km Mazar Sharif – Sheberghen road ..

Replace existing timber bridge of 30.3m long with new reinforced ..

Construction of road widening from the existing dual 3-lane carriageway to ..

Improve connectivity to Kuala Lumpur Sentral Station and MRT Muzium ..

Construction of 4 new lane of 1km bridge and 3.5km of ..

The proposed BRT – Sunway Line will involve construction of ..

The bridge consist of 24m single span pedestrian crossing bridge..

Monorail Bridge from the KLIA main building to Transit Block..

Wetland crossing and flyover at interchanges, Phase 1A Package R2 & R3..

Kelana Jaya LRT from Kelana Jaya Depot to Putra Heights..

Independent Check Engineer for Design and Constructions..

Construction of 31.8 KM elevated highway from Sungai Besi to Ulu Kelang. .

Minconsult Sdn Bhd

Minconsult Sdn Bhd