Proposed sAMALAJU port

Client
Jurutera Minsar Consult Sdn Bhd
Project Completion
29 May 2009
Brief Project Description
The proposed Port site is located within one part of the Government’s Samalaju Industrial Area which is approximately 6,000 ha or 15,240 acres in size facing the South China Sea. The site is located on logged over secondary forest and oil palm plantations (OPP) between Tg. Borgam and Tg. Samalaju
The Master Plan for Samalaju Industrial Park prepared by the Ministry of Planning and Resources Management has identified the coastal frontage of Wiser Bay area between Tg. Samalaju and Sg. Selungun in the vicinity of the proposed aluminium smelter and poly-silicon plants, as a Port area.
Services Provided
Engineering Consultancy:
The study included:
Carry out Geomorphological investigation and prepare a Geomorphological report.
Provide geotechnical engineering support to develop design concept for jetty and landside port infrastructure.
Provide necessary subsoil parameters required for MINSAR to carry out further design of the jetty and Admin building.
To carry out preliminary geotechnical assessment, including slope stability analysis for the foundation of breakwater.
Prepared concept design for electrical power supply system, telecommunication system, fire fighter system, internal water supply system and Mechanical & Electrical building services.
Provide engineering support to develop concept layout for jetty and port structure including review of report by a port management expert
Key Significance of the Project
Preparation of Master Plan for Similajau Port, located within the Similajau Industrial Area in Sarawak. The consultancy work comprises preparation of geomorphological investigation and report, planning of port concept, foundation for breakwater and M&E services for port landside