Lumut Combine Cycle Power Plant

Client
Zelan Construction Sdn Bhd
Project Completion
2002
Brief Project Description
Installation of an additional one block of 650MW Combined Cycle Gas Turbine (CCGT) to the existing 2x650MW CCGT
Services Provided
Detailed Engineering of Civil, Foundation, Structural, Architectural, Infrastructure Works, M&E Building Services Local/Statutory Approval and Site Supervision
Key Significance of the Project
Lumut or Segari Power Plant is a combine cycle gas turbine power plant which was designed with net output 1,300MW power generation making it is the biggest gas-fired power plant in Malaysia. It was designed with latest technology to reduce emissions and effluents below the good level requirement due to the demand and additional block was installed at the existing plant