Tower 3, Pj Sentral

Client

Malaysia Resources Corporation Berhad (MRCB)

Project Completion

2019

Brief Project Description

Tower 3 consisting of 27 storey superstructure above an integrated podium with 5 basement floors and adjoined to 4 other towers

Services Provided

Detailed Design of superstructure, Construction Supervision and BIM execution

Key Significance of the Project

Tower 3 was designed with a combination of RC and Post Tensioned Concrete frame system connected to the centre RC core wall frame. Wind tunnel analysis and detailed coordination was carried out using Revit 3D model. Potential clashes with services were eliminated using the Clash Analysis feature

Tall Buildings Structures and Specialized Structure Portfolio

Minconsult Sdn Bhd

Minconsult Sdn Bhd