Lumut Combine Cycle Power Plant

Client

Zelan Construction Sdn Bhd

Project Completion

2002

Brief Project Description

Installation of an additional one block of 650MW Combined Cycle Gas Turbine (CCGT) to the existing 2x650MW CCGT

Services Provided

Detailed Engineering of Civil, Foundation, Structural, Architectural, Infrastructure Works, M&E Building Services Local/Statutory Approval and Site Supervision

Key Significance of the Project

Lumut or Segari Power Plant is a combine cycle gas turbine power plant which was designed with net output 1,300MW power generation making it is the biggest gas-fired power plant in Malaysia. It was designed with latest technology to reduce emissions and effluents below the good level requirement due to the demand and additional block was installed at the existing plant