Teluk Lipat
Client
East Coast Economic Region Development Council (ECERDC)
Project Completion
2017
Brief Project Description
Coastal Protection Works to protect beach erosion from Sg. Dungun river mouth to Sg. Sura river mouth
Services Provided
Engineering Study, Detailed Design and Supervision for Coastal Protection
Key Significance of the Project
The total study area comprises 9.7 km and the detailed design involved 8 headlands and its beach nourishment. Minconsult was awarded with the 2017 ACEM Engineering Awards – Gold Award of Special Merit for Coastal Protection Works at Teluk Lipat, Dungun Terengganu