Feasibility Study of Rupsha 800 MW (LNG & HSD)

Client

North-West Power Generation Co. Ltd.

Project Completion

2017

Brief Project Description

The feasibility study would consider that, this plant would be a duel fuel type with the provision of running by regassified LNG to be imported from India and Middle East.

Services Provided

Performs feasibility studies to assess the viability of the project; establish technical, financial and economic feasibility of the proposed power plant.

Key Significance of the Project

The feasibility study would consider that, the plant would be a dual-fired (R-LNG and HSD) based combined-cycle power plant and will be able to operate with flexibility i.e. as a peaking and base load.

Power Plant & Renewable Energy Division's Portfolio