Minconsult Sdn Bhd

Menu

REDEVELOPMENT OF ALOR Setar

The Government of Malaysia, in year 2002, intends to redevelop the airport at Alor Setar to handle aircraft up to and including the Airbus 330 aircraft.

Client

Government of Malaysia

Project Completion

 

2005

Construction Cost

RM 78 Million

Brief Project Description

The Government has invited Road Builder Bhd as a ‘design and build’ Contractor, through tendering process, to undertake the investigation, detailed design, construction, installation, completion, testing, commissioning and maintenance of the redevelopment. Minconsult was thereafter appointed Engineer by Road Builder to be responsible for the design of the redevelopment works.

Services Provided

The scope of works include the:

  • extension of the existing runway of 1963m to 2745m with 45m runway width and 7.5m shoulder on both sides;
  • strengthening of the existing runway pavement to accommodate the A330 aircraft;
  • new aircraft parking apron and taxiway;
  • perimeter roads;
  • ground treatment and drainage system;
  • new Aerodrome Ground Lighting and Instrument Landing System;
  • all mechanical and electrical works including sub-stations, required for the normal operation of the Airport; and

all designed to International Civil Aviation Organisation (ICAO) standards.

Airport Division's Portfolio​

Minconsult Sdn Bhd

Minconsult Sdn Bhd