RISK ASSESSMENT FOR THE LINKWAY PROPOSALS

Client

LAND PUBLIC TRANSPORT COMMISSION, MALAYSIA

Project Completion

2014

Brief Project Description

Improve connectivity to Kuala Lumpur Sentral Station and MRT Muzium Negara Station to cater for the needs of the disabled as well as to handle heavy passanger volume during peak hours

Services Provided

Perform risk assessment on the design, construction, operation and maintenance of linkway proposals before recommendation for preferred option

Bridge Division's

Portfolio

Construction of all infrastructure works including trackworks, earthworks ..

The project road is about 110 km Mazar Sharif – Sheberghen road ..

Replace existing timber bridge of 30.3m long with new reinforced ..

Construction of road widening from the existing dual 3-lane carriageway to ..

Improve connectivity to Kuala Lumpur Sentral Station and MRT Muzium ..

Construction of 4 new lane of 1km bridge and 3.5km of ..

The proposed BRT – Sunway Line will involve construction of ..

The bridge consist of 24m single span pedestrian crossing bridge..

Monorail Bridge from the KLIA main building to Transit Block..

Wetland crossing and flyover at interchanges, Phase 1A Package R2 & R3..

Kelana Jaya LRT from Kelana Jaya Depot to Putra Heights..

Independent Check Engineer for Design and Constructions..

Construction of 31.8 KM elevated highway from Sungai Besi to Ulu Kelang. .

Minconsult Sdn Bhd

Minconsult Sdn Bhd