SHEBERGHEN - ANDKHOY ROAD

Client

MINISTRY OF PUBLIC WORKS, AFGHANISTAN

Project Completion

2007

Brief Project Description

The project road is about 110 km Mazar Sharif – Sheberghen road section and the 48 km section of the Sheberghen – Andkhoy road

Services Provided

Detailed Engineering Design of bridge and Project Management relating to works

Bridge Division's

Portfolio

Construction of all infrastructure works including trackworks, earthworks ..

The project road is about 110 km Mazar Sharif – Sheberghen road ..

Replace existing timber bridge of 30.3m long with new reinforced ..

Construction of road widening from the existing dual 3-lane carriageway to ..

Improve connectivity to Kuala Lumpur Sentral Station and MRT Muzium ..

Construction of 4 new lane of 1km bridge and 3.5km of ..

The proposed BRT – Sunway Line will involve construction of ..

The bridge consist of 24m single span pedestrian crossing bridge..

Monorail Bridge from the KLIA main building to Transit Block..

Wetland crossing and flyover at interchanges, Phase 1A Package R2 & R3..

Kelana Jaya LRT from Kelana Jaya Depot to Putra Heights..

Independent Check Engineer for Design and Constructions..

Construction of 31.8 KM elevated highway from Sungai Besi to Ulu Kelang. .

Minconsult Sdn Bhd

Minconsult Sdn Bhd