PROTON Semi High-speed Test-track Project

Client

Nippon Road (M) Sdn Bhd

Project Completion

1994

Brief Project Description

Design & construction of various car testing facilities at Proton plant.

Services Provided

Detailed engineering designs of car testing facilities for PROTON under a turnkey contract.   

Key Significance of the Project

The facilities include a 1650m semi high-speed test track at top speed of 120 km/h with 45o steep-bank curve at each end. Also includes a 140m long shower/wading trough, a 500m long brake test track and 30 simulation tracks with several different roadway surfaces

Geotechnical Division's Portfolio

Minconsult Sdn Bhd

Minconsult Sdn Bhd